Build Tutorial

1. Lay out the entire kit for easy assembly
2. Place Viton Oring on Reservoir
3. Place reducer on reservoir
4. Loosely place clamp over reservoir assembly
5. Place reservoir heater wires the space in the reservoir clamp and tighten the clamp
6. Wrap reservoir with reservoir heater and retain with included velcro
7. Place retaining clamp on retort stand
8. Place heater assembly on retort stand and secure the retaining screw
9. Thread in quick connect fitting
10. Place the line in the fitting
11. Hook the spring hook from the wired end on to the reservoir clamp
12. Wrap the heat belt loosely around the reservoir twice
13. Run the heat belt over the retaining spring, and pull tight to secure
14. Wrap the heat belt over the line
15. Secure spring hook over syringe tip



4 thoughts on “Build Tutorial

  1. is the syringe able to be cleaned

    1. You can disassemble the syringe easily for cleaning

      TUTORIAL

    2. syringe can be cleaned with 91% isopropyl alcohol

  2. It sounds like your feed side fitting and valve bearing should switch places with the spring. Here is a picture of the correct order of all the dispenser components.

Leave a Reply to admin Cancel reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.